Cloud Solutions

Cloud infrastructure that's architected, not just lifted-and-shifted

RiT Global plans, migrates, and operates cloud environments across AWS, Microsoft Azure, Microsoft 365 and Google Workspace — balancing performance, cost, and compliance from day one.

AWSMicrosoft AzureMicrosoft 365Google WorkspaceCloud MigrationFinOps & Cost Optimization

Overview

A cloud migration that isn't architected for your actual workload just moves the same problems to a more expensive location. RiT Global starts every cloud engagement with a workload assessment — right-sizing compute, mapping data residency and compliance requirements, and identifying what should move as-is, what should be re-platformed, and what shouldn't move at all.

Once live, we don't hand the environment back and walk away. Our cloud operations team manages cost, performance, security posture and platform updates continuously across AWS, Azure, Microsoft 365 and Google Workspace, with monthly optimization reviews.

Business Challenges We Solve

  • Unplanned migrations that inflate cost. Lift-and-shift approaches move inefficient architecture into a pay-per-use environment, spiking bills.
  • No one owns cloud security posture. Misconfigured storage buckets and overly permissive IAM roles are the leading cause of cloud breaches.
  • Compliance uncertainty in the cloud. Teams aren't sure which controls satisfy HIPAA, PCI-DSS or data-residency requirements once workloads move.
  • Multi-cloud and SaaS sprawl. AWS, Azure, M365 and Google Workspace are managed by different people with no unified visibility.
  • No cost governance. Cloud spend grows unchecked with no regular right-sizing or reserved-capacity strategy.

Technical Solutions

AWS Managed Services

Architecture design, migration, and 24/7 operations across EC2, RDS, S3 and core AWS services.

Microsoft Azure Managed Services

Landing zone design, VM and PaaS management, and Azure AD/Entra ID governance.

Microsoft 365 Management

Exchange Online, SharePoint, Teams administration, licensing optimization and security hardening.

Google Workspace Management

Admin console governance, Gmail security, and Drive/data-loss-prevention policy.

Cloud Migration Process

Every migration follows a phased approach designed to eliminate surprise downtime and validate each workload before full cutover.

01

Discover

Workload & dependency mapping

02

Plan

Target architecture & TCO model

03

Pilot

Low-risk workload migrated first

04

Migrate

Phased cutover by workload group

05

Validate

Performance & security testing

06

Optimize

Cost tuning & reserved capacity

Features

  • Cloud readiness assessment and total-cost-of-ownership modeling
  • Landing zone / account architecture design for AWS and Azure
  • Phased, workload-by-workload migration with rollback plans
  • Continuous cost optimization (FinOps) and reserved-instance planning
  • Identity governance across Azure AD/Entra ID, AWS IAM and Google Workspace
  • Backup and disaster recovery configured for every migrated workload
  • Monthly cost, performance and security posture reporting

Benefits

Lower total cloud spend

Ongoing right-sizing and reserved-capacity planning typically cuts cloud bills 20–40%.

Zero-surprise cutovers

Phased migration with validation gates avoids the downtime that rushed lift-and-shifts create.

Compliance-mapped architecture

Data residency, encryption and access controls mapped to your regulatory framework from day one.

Technologies Used

Service Process

01

Assess

Environment & risk audit

02

Design

Target architecture & roadmap

03

Implement

Deployment & controlled cutover

04

Secure

Hardening & policy enforcement

05

Monitor

24/7 NOC/SOC observability

06

Optimize

Quarterly reviews & tuning

Migration & Support SLA

Phase / SeverityTargetDescription
Migration Cutover WindowPre-agreed maintenance windowScheduled with rollback plan and stakeholder sign-off
P1 — Production Outage15 min responseCloud-hosted production service down
P2 — Degraded Performance1 hour responseElevated latency or partial service impact
Cost Anomaly AlertSame business dayUnexpected spend spike investigated and reported

Deliverables

Cloud Readiness Report

Workload assessment & migration plan.

Target Architecture Diagram

Landing zone & network design.

Migration Runbook

Step-by-step cutover procedure.

Monthly Cost Report

Spend breakdown & optimization actions.

Security Posture Review

IAM, encryption & config audit.

DR Configuration Doc

Backup & recovery setup per workload.

Service Tier Comparison

CapabilityEssentialAdvancedEnterprise
Platforms ManagedSingle cloudMulti-cloudMulti-cloud + SaaS
Cost OptimizationQuarterly reviewMonthly reviewContinuous FinOps
Migration SupportGuidedFully managedFully managed + re-platforming
Security Posture ReviewAnnualQuarterlyMonthly

FAQs

Can you manage a hybrid AWS and Azure environment?

Yes, we are vendor-neutral and regularly manage multi-cloud and hybrid on-prem-to-cloud architectures.

How long does a typical migration take?

A mid-size environment (50–200 workloads) typically takes 8–14 weeks from discovery to full cutover.

Do you handle Microsoft 365 and Google Workspace licensing?

Yes, we manage licensing optimization as part of ongoing SaaS administration to avoid overpaying for unused seats.

What happens if something breaks during migration?

Every workload has a tested rollback plan; migrations occur in pre-agreed maintenance windows with stakeholder sign-off before and after.

Free Cloud Solutions Assessment

Get a cloud readiness assessment

We'll map your current environment and show you the migration path, timeline, and expected cost impact.

Request Assessment Call +91 805.805.7800